Create an early budget range from a simple, visible coefficient model.
All rates and factors below are internal assumptions for this estimate.
| Board area | 100.00 cm² |
| Base area rate assumption | $0.06 / cm² |
| Layer factor | × 1.00 |
| Combined thickness, copper, finish, and color factor | × 1.000 |
| Quantity-tier multiplier | × 0.90 |
| Displayed uncertainty band | 75%–130% of model midpoint |
Not a quote: these coefficients are deliberately simple internal estimating assumptions, not authoritative market or factory pricing. Setup, tooling, testing, shipping, taxes, lead time, and detailed design rules are not modeled.
This tool applies fixed internal planning assumptions to board area. It is not connected to live material, factory, freight, tax, test, tooling, or lead-time pricing.
Use the range for early comparisons only. A formal quote can account for routing, drill sizes, tolerances, impedance control, panel utilization, documentation, and other manufacturing requirements.